Almost imperceptively slow progress

Turns out that there's a ton left to do on the frame rings/bulkheads.  They're in the right shape, but to make them waterproof, I'll be putting at least a full coat and maybe two of epoxy all over.  A couple of the frames will have waterproof hatches and/or inspection ports.  The inspection ports need small backing rings, and the big hatches need backing frames.  The round holes in the frame above access the areas behind the cockpit seats.  That frame creates the back of the cabin house/front of the cockpit, so those ports will be accessed from inside the cabin.  Since it's way easier to cut them out and apply the backers before they're installed, I'm doing that.  

On the subject of stringers, we spent last Saturday buying, planing and ripping up stringers.  We decided on 2x8x 12' prime kiln dried Douglas Fir studs.  This helps us avoid most of the bad knots.  The kiln dried part keeps us from having to wait months for the wood to dry.  No need to carry a bunch of water in the wood around the world.  The stringers need to be about 20-21 feet long.  Since our raw stock is only 12' long, we'll have to put a joint in each stringer.  Pics and methods to follow.

Comments

Popular posts from this blog

Read at your own risk...

Welcome to the world, keel halves!

Initial Weigh In...